Project Description

BER Rating

This project was SEAI funded through Superhome.ie.

Pre Works BER D2 Post works BER A2

Measures included in this upgrade are:

  • Replacement of all windows and doors
  • Replacement of the oil-fired boiler with an 8.5kW air to water heat pump
  • Under floor heating to the ground floor
  • Alu Rads to first floor
  • Attic Insulation
  • Demand controlled ventilation system
  • Solar PV Panels
  • Wood burning stove
  • Energy Monitoring System