Project Description

BER Rating

Pre works BER  F              Post works BER  A2

Air tightness result 1.26 Air changes per hour  (at 50 Pa, [m³/h/m²] 1.264).

This project was SEAI funded through Superhome.ie

Project Description: The house was inefficient there was very little insulation and the walls were damp.

Measures included in this upgrade are:

  • Replacement of all windows and doors
  • Replacement of the oil-fired boiler with an 8.5kW air to water heat pump
  • Under floor heating throughout
  • External Insulation
  • Attic Insulation
  • Demand controlled ventilation system
  • Solar PV Panels
  • Wood burning stove
  • Energy Monitoring System

Here is the homeowner speaking about her experience of the upgrade.

Below are image of the house before during and after