Project Description
Sola began works on one of Dermot Bannon’s 2019 Room to Improve homes.
Pre Works BER D2 Post works BER A1
Measures included in this upgrade are:
- Replacement of all windows and doors
- Replacement of the oil-fired boiler with an 8.5kW air to water heat pump
- Under floor heating to the ground floor
- Rads to first floor
- Attic Insulation
- Cavity
- Demand controlled ventilation system
- Solar PV Panels
- Energy Monitoring System
This project was grant aided by SEAI
Here is a snippet of the show where Dermot came to view our new showroom.